DAC's profile

New Contributor

 • 

1 Message

Closed

New Installation In A Rental Property

Hi!  I have placed an order to switch to Gigablast service.  It requires to install a new fiber optic cable into the house.  Is there a sign-off process for the owner of the house that I rent?  I am not comfortable with having holes drilled and lines routed without acceptance by the homeowner.  I have a large security deposit that I don't want to risk. 

Moderator

 • 

4.3K Messages

Hi DAC,

After placing your order, did you receive a phone call from a Gigablast Specialist to review the details of your order? Since you are a renter, we may need a Letter of Permission (LOP) from the homeowner before we can proceed with the installation. That's one of the details that would be better answered by a Gigablast Specialist. Once an order is placed, you should receive a phone call within 2 days so we can review the details with you and schedule the installation. When did you place your order?